Risk Assessment | Hydraulic Utilization Complexes

Evaluación de riesgos

Gouvães, Alto Tâmega and Daivões dams and hydroelectric power plants.

Tâmega River, Portugal

The Government of Portugal awarded Iberdrola the DBO (Design, Build and Operation) contract for a unique and outstanding project.

 

What did the project involve?

 

The project involved three hydraulic utilization systems:

1. Gouvães hydropower system – Dam on the Torno River (a tributary of the Tâmega) and a (mainly underground) channel connecting to the Daivões reservoir.
  • It includes a pumping station and a reversible hydropower plant built into the mountain.
  • The dam is a concrete gravity type, 30 m high and 232 m long at the crest, with a reservoir surface area of 175 ha.
  • The channel has a length of over 7 km, and the hydropower plant has a capacity of 880 MW.
2. Alto Tâmega hydropower system Dam on the Tâmega River:
  • Located just upstream of the Daivões reservoir.
  • It includes a non-reversible hydropower plant.
  • The dam is a double-curvature concrete arch type, 106 m high and 334 m long at the crest, with a reservoir surface area of 466 ha.
  • The hydropower plant has a capacity of 2 × 80 MW.
3. Daivões hydropower system Dam on the Tâmega River:
  • Located with the purpose of creating a reservoir downstream of the Daivões dam.
  • It includes a conventional hydropower plant.
  • The dam is a concrete gravity-arch type, 77.5 m high and 265 m long at the crest, with a reservoir surface area of 341 ha.
  • The hydropower plant has a capacity of 2 × 57 MW.

Additionally, the project included the generators and transformers, high-voltage lines, electrical substations, mechanical equipment, access roads, auxiliary buildings, and other necessary facilities and equipment, with a total budget of €1.074 billion.

 

Risk assessment by Ineria

 

A major international insurance group had to carry out a risk assessment of the project related to civil liability, third-party damages, and environmental liability.

To carry out this work, the company hired Ineria Management to perform a Desktop Project Review, with the aim of obtaining useful information to help identify certain project risks.

 

Ineria provided the client with a team of consultants specialized in infrastructure risk analysis, who completed their mission within the tight timeframe required.